8 Decent Work and Economic Growth

UNDP takes solar energy to forest villages

UNDP takes solar energy to forest villages
8
The Unified Nations Development Program – UNDP]]] is a project that aims to expand electricity production facilities from solar energy to increase the capacity of Turkey in the solar energy field. Sustainable Finance Mechanism Project[[, [Orman General Directorate of Forest and Rural Relations Department (ORKÖY)]]] in the leadership of private sector solar photovoltaic - PV installation companies, private sector networks, domestic and foreign banks.
]]

]]
]] The project goal to develop in the following areas:[
]]]]
]]- Minimum ]]30 MW connected to the grid through cooperatives in forest matters]]]] partnership of a awareness energy enters the credit threat of ORKÖY to provide solar PV power [
- Preventing carbon emissions equivalent to 28.750 tons CO2 in energy industry[
]- Network-connected PV systems ]]]]30 MWp access to cumulative board power[[[
- In the year of PV systems connected to the network ]]47.520.000 kWh]] provide cumulative total electrical production[
]
- Opening of 450 ]]
[
]
According to the information shared byUNDP, the population of refugees in Turkey is about 7,3 million]]]. This figure creates 9,6% of the country’s population and 35% of the country’s population. Forest peasants in 2004 400 Dollar]] with an average annual gross revenue]]]] 5.780 Dollar]] creates the poorest part of Turkey compared the national average. The challenges faced in access to financial possibilities of disadvantaged segments lead to a jealousy cycle from this income group. [
[[
[
[
With the project, the aesthetic model in the forest surrounded by Turkey is supported by the promotion and return of solar PVs connected to the network. The cost of forest leaders are looking at innovative public-private sector business models to provide low-rise solar PV. [
[
[
The project ]sosyal development[]]]]] is believed to wealth women]]]]]] in operation, maintenance and cleaning functions of these facilities in the forest where electricity production plants are installed. [

]
Pilot Afyon, Çorum, Elazığ, Konya]]] The project started in 2020 will be Şişli.

You can get detailed information about the project ]]]]]]]]]]] from the site.

[

Source: Sustainable Development