Not Need, Rant Tool
27.08.2009 Birgün
]]]] [
MachineEngines Chamber, which treasures the 3rd bridge project as the need for 'Istanbul, has presented the alternative to the development of marine and iron road transportation as the solution of the plan of the traffic ring of Istanbul
The description of the steel remains as follows: "This fact was Confed in the description of the Minister of Environment and Forest. Mr Minister said that he approached the ‘containing with tenderness to the forest, with the Ministry of Transport, he discusses this thread, in some regions, the 'gerekirse' tunnel failure. There is no concrete basis of what the Minister of the Environment count, my statement is completely misleaded to the public. The Minister will be destroyed by Beykoz, Ömerli and Şile difficulties if in the European Side of the construction of a bridge to be held in the area, Belgrade, Forkca, Kemerburgaz, Fatih Kaymakcı, Anatolia Side, Beykoz, Ömerli and Şile proxies, where to pass the route, if the northern will suffer from a large part, the conflict mass organizations operating in this area if it does not know that will pollute the water fountains in the region, can get support civil society organizations, scientists and professional rooms. We said that the machine is the most rational solution of the rail system in urban transportation as the Chamber of Engineers. With scientific, rational methods, it is necessary to activate the normal and rail (series) systems that are considered on the long-standing rail, and to be coordinated with the bus, and sea transportation of these systems. For this, it is necessary to work with disaster and friendly rooms, especially for urban residents. "
] ]]]Source: News