Itire from ministry and DSİ!
07.07.2010 Radikal
RIZE - In the report study by the Ministry of Environment and Forest, which examines the hydroelectric power plant constructions made in the valleys and health care by the State Water Works Ambassador, the "big destructions in the body" was included in the opinion. The Board created for each month inspection of HES constructions cut a fine of 513 thousand pounds to 15 energy companies that destroy nature.
[[T]]DSİ officials with the Ministry of Environment and Forest, reviewing the constructions of hydroelectric power plant (HES) which was built in valleys in Rize in reports on the existing situation and measures to be taken. The report that the refusal of the large destructions in nature of the opinion that the environmental authorities have also confirmed the demands that the environmental authorities are far ahead. [[[T]] [[Raporda said:
]“The water transmission tunnels have been opened due to the constructions of the current HES and large destructions in forest areas with the futuremoves in the areas where the cebri pipes pass. Dere bearings are filled, water current regime and quality are negatively affected. Since the necessary measures are taken in the work carried, the environmental pollution occurred, the need to be left to the dere bed in the past facilities, the insufficient, fish passages were never done or built appropriate. “
]]]The Measure required to leak]
]Some of the measures to be taken for the hydroelectric power plants that continue to be made in the hydroporda are listed as follows: [[
1- A control board consisting of Environmental and Forest Directorate and Agricultural Directorate in areas where project take place, constructions should be renewed every month.
]2- The flow device should be put into the dere beds for the control of the water to be left in HES project. This device data should be monitored regularly, the penalty should be applied to companies that do not insert devices.
3- After that the change should not be warmed into the obstacles project. Dereler should be eaten by adding in the bed. Tunnel type project should be prepared to the plan of the channel, if this project is not appropriate, it should be abandoned in the HES construction in that region.
4- Applications related to fish passages should be placed in projects and treated sensitively in its implementation.
5- The amount of water to be left to the dere beds should be 10 years of the average of the last 10 years.
6- In the energy transmission lines, the available lines should be used first, in sac where this is not possible, instead of a line withdrawal from each project, all the facilities should be projected a transmission line connected even.
7- The necessary commitments from the EPDK project owners must be made and the necessary sanctions have been made.
8- Project owners should inform the control board before they start to work and start working without knowledge.
In the audits made by the HES Control Board created by the meantime, a fine of 513 thousand pounds to the 15 energy companies that destroy nature and take the necessary measures. Fixed Kandemir, Managing Director of Rize Environment and Forest, said that the built-in board will be controlled in construction sites such as every month, the necessary against the work that destroy nature will be applied.
Source: News