Hani was the Dereler Institution?
25.08.2010 Birgün
]]
] In the past days of the Prime Minister Erdoğan, the Hydro Power Plants (HES) as a result of the opening of a hydroelectric power plant in Rize Gemidere are constantly adding new to the derees that are not established as a result of the power plants that claim that the ‘conference types’ is a lie that they are satelliteed. Finally, the 11 km part of the Melet wind from the largest rivers of the Black Sea was on the foot of the wind and began operating in October 30, 2009, Darica-1 experiments to the structural-information energy group He was completely dry due to HES.
A Condition that dere beds are due to their projects, especially in Eastern Black Sea. The Castle Hydroelectric Power Plant, which was built in Rize Southsu, which was previously located in the village of Prime Minister, was completely dried in the four-kilometer sections of Gürgen dere, due to the launch of the trial production of Gürgen dere. A statement about the Prime Minister against the reflection of the press. The construction of new HEPP projects, which belongs to the Çalık group, which is the owner of Prime Minister's earth.
]]]]‘Environmental
]]]]]]]]The Prime Minister Erdoğan opened the opening of the Walnut HES, which was judged by the economists in Rize Gemidere, and in the speech he made here, he said that the ‘conference types’ associated with HES’ in his speech. Erdoğan said that the organization of derelers defended that derelers were not left in a lie that satelliteed. Erdoğan also found that HES didn’t use water during the reduced period of water.
]]]Source: News