When the project is by the Metropolitan Municipality, the facility will be installed in the garbage storage field, the energy will be produced until 4 thousand housing per day. The facility will be tender for 10 years with the model of the do-let-devret.

[[T]]Constant Mayor of Metropolitan Municipality Tahir Akyürek said they continue to cut down the environmental investments as municipality. [[[T]] [[

Akyürek, which expresses that 3 shifts were stored for about 35 years in the Aslım region of Aslım, where about 110 vehicles were collected in Seljuk, Meram and Karatay county arbitration. The irregular storage used since the years with the program70 has been rehabilitated by solids since 2004. In this field, water drainage layer has been created and stored in a healthy way, suitable for dirty water technique. Today, thanks to the project we will produce energy from this garbage with the facility to be installed in the region. [

Akyurek collected methane intervalsing of solid waste storage space, highlighting that is converted into electricity energy in the enclosure to be installed, with this project, the storage process wascock in the Aslım area with 10 hectarlik reported they alternate to evaluate the mass of 1.2 million square meters of cube waste.

]

] will produce energy up to 4 bin housing]

Akyürek, who explains that the right of business is tendered for 10 years with open offer usulu on 25 November 2008, said:

]] In the scope of

, methane, consisting of solid waste mass and 21 times more global warming potential than carbonized, will be converted into electricity energy with the facility to be installed. In this way, both emissions reduction and energy generation will be displayed. We forecast that the energy capacity of the plant will be 1 megawatt per hour. The residence tendered for 10 years with the model of the construction-business model can produce energy up to 4 thousand housing per day when it starts working with full capacity. '

Akyurek is also expressed that a system to be placed on the field, which will be given again by means of the back cycle of the debris removal water collected in the pool, thanks to this system, and reported that both biological regulations (fermanation) will be accelerated and the gas production will be expected and the logic water will be absorbed by the water will be absorbed..

, detached the fact that they are not in the tender specification, Akyürek said they plan to evaluate in the greenhouse, which will be released in the plant, noted that the carbon dioxide gas emitted in the plant will be distributed by plants to oxygen.

] [

Akyurek will turn into an important step for the prevention of environmental pollution, unlike any harm to the environment at the end of all these activities, "Aslım Rubbish with this project will turn into an organization that produces energy. For the tendered facility, he spoke to the Energy Market Supervision Authority and the process of receiving permission from the Ministry of Environment and Forest. [

Akyurek added that the operator waslly to operate in June 2010 with its licensing times.