7 Affordable and Clean Energy

Bodrum's Finished Documented

Bodrum's Finished Documented
7

09.06.2009 Radikal

The change spent in 44 years of Bodrum was documented with three photos. The difference between 1965, 2005 and 2009 Bodrum is creepy. Building on the district center did not stay unconstructed plot[

[[T]]]Airkart company has come to Timur Kara Bodrum in 2005 and themeed last month. District of the sea. Bodrum Peninsula has 200 thousand homes according to to 2008 conflict. 527 kilometer peninsula 1166 real estate broker, 736 accommodation facility, the population has three-solid second housing, many booms... [[[T]] [[

Bodrum's concrete in 44 years, accompanied by appetite. In 1965, 2005 and 2009, the photos taken in the Aegean’s tourism pearl arises. [

In the center of the county, which is to the concrete battery according to the last photo taken from the month of the week, there is almost no building plot on it.

The idea of Bodrumians in accordance with Bodrum to Mehmet Kocadon with Bodrum Mayor DP, which emphasizes that there are only treasure lands of unstructured places. “Bodrum must killer push’s time to stop. Bodrum is the rest of Bodrum. All Bodrum Peninsula was announced in 2006. After a two-year fight, we hadn’t put the case against it, this case turned from Daniştay. Now the north part of the peninsula was declared the tourist center. To date, all of the decisions taken without resort Bodrum were judged. You can talk to the public with local administration.

]]

]]]'Do not fortune by scratching the foot']]] [

After the year in Turkey, the increase of tourists was 22 percent of Bodrum in 5 percent. The plot was renovated in ‘Bodrum Meeting. “I’m going to draw Bodrum panorama is very inner pain. The peninsula with a 527 kilometer was the victim of rapid and palpitation. 1166 property broker has 736 accommodation facilities. We are the city of tourism! The population has three times second housing. In front of the Esnaf shop, it explores the distance of foot fingers, then if it tries to fortune tourists from the store, you can not mention the quality of service in tourism.

]

Who will script?]]]

We are all of us
(Legged poplar Mayor CHP Mustafa Saruhan): It is necessary to solve all kinds of problems, including problem construction for construction. We are all losing if we are going to enter jealousy.

]Axis inaccuracy[

]]](Mimars Chamber Bodrum Wish Mahmut Yıldırım): There were a lot of plots available in Bodrum. The following plans will be held in the public hand. The uncertainty people for what planning will be. Planning authority is at the Ministry of Tourism, creating the impression that these are snacks to one of the nearby. (...) The section that is right to Gökova in Yalı Municipality is filled with structure. This was announced in the ‘Culture and Tourism Development Zone’ before 15 years. It was planned for 15 years. It says ‘Home making, childbearing, business building’. If you don’t do anything for 15 years, someone goes away and installs leak structures. We can’t say that the central authority has a positively single nail. If Bodrum is left to Bodrum, the problem are accessible.

No water, it takes to be done
]
( Filiz Kneedar from Blue Road Initiative): Very serious problems are experienced in Bodrum Peninsula. Now it is necessary to make a revision plan. In addition, all infrastructure studies have been Hammam, agricultural fields are decided to be done at the rate of structure after watering areas are observed. Despite being our unfortunate water, the construction is guaranteed. We have swallows to keep underground waters. abroad provide large part of their income from construction. The structure of the crossroad is active in this competition. This condition is now necessary to stop. [

]]]Click to access the page
]

Source: News